2. PM Evaluation
Note that neither of the two possible transitions from step 2 are conditional. The PM will always be presented with the same two choices for the next step.
| Tab | Field | Value |
|---|---|---|
| General | Step Name | 2. PM Evaluation |
| General | Limit Step Duration | Selected
|
| General | Duration | 7 days |
| General | Relative To | <Leave blank>
|
| Participants | Notification Type | Ordered (does not matter because there is only one participant) |
| Participants | To | PM |
| Participants | Authorized |
PM Administrators group Reference to current value of Responsibility property value |
| Exception Notification | To |
PM General Manager |
| Step Notification | Importance | Normal
|
| Step Notification | Notification Interval | 4 days |
| Step Notification | Subject | <Leave blank> to use the default step notification message.
|
| Step Notification | Body | <Leave blank> to use the default step notification message.
|
| Form Options | <Leave blank>
|
|
| Status Notification | To | <Leave blank>
|
| Next Steps | Condition | <otherwise>
|
| Next Steps | Next Steps |
3. EM Processing 6a. Not Implemented |
| Dynamic Defaults | Property | Workflow Status
|
| Dynamic Defaults | When equals value | 2. PM Evaluation |
| Dynamic Defaults | Assign Property: | Comment
|
| Dynamic Defaults | Value: | Status is 2. PM Evaluation |
| Workflow Extensions | Workflow Extensions | <Leave blank>
|

